Commercial hybrid
50 kW High-Voltage Hybrid Inverter
MODEL REFERENCESUN-50K-SG01HP3-EU-BM4
- AC output
- 50 kW
- Battery
- 160–800 V
- MPPT trackers
- 4
SG01HP3-EU family view shared by the 30 / 50 kW configurations.

SG01HP3-EU family view shared by the 30 / 50 kW configurations.
Supplier-reference photography. Confirm the final equipment appearance and included accessories with your quotation.
Technical reference SUN-30K-SG01HP3-EU-BM3
An entry commercial high-voltage hybrid configuration for site-level solar and storage coordination. Define the battery communication, transfer arrangement and operating strategy before finalizing the complete system.
Configuration, availability, certification scope and commercial terms are confirmed at quotation.
Values below follow the referenced model or explicitly stated model family. Review the final datasheet, rated conditions and supply scope before procurement.
Deye — official high-voltage hybrid specifications
Reference model: SUN-30K-SG01HP3-EU-BM3
Reviewed: 2026-10-15
Battery compatibility, transfer architecture and local grid acceptance require project-specific confirmation.
| Rated AC input / output | 30,000 W |
|---|---|
| Nominal AC voltage | 220 / 380 V or 230 / 400 V |
| Grid frequency | 50 / 60 Hz |
| Battery voltage range | 160–800 V |
| Max. charge / discharge current | 50 + 50 A |
| Battery inputs | 2 |
| Max. PV input power | 48,000 W |
| Max. PV input voltage | 1,000 V |
| MPPT voltage range | 150–850 V |
| MPPT / strings per tracker | 3 / 2+2+2 |
| Max. continuous AC passthrough | 200 A |
| Max. conversion efficiency | 97.6% |
| Ingress protection | IP65 |
| Dimensions (W × H × D) | 527 × 894 × 294 mm |
| Weight | 80 kg |
| Cooling | Intelligent air cooling |
Published reference values are not a substitute for the final selected-model datasheet and project design.
The complete system must account for site loads, electrical interfaces, environmental limits and local installation requirements.
Explore the planning guideShare your country, quantity, electrical requirements, installation environment and delivery plan. Ask for the final datasheet and supply scope for this reference.